How to Build a 33-Storey Tower in 135 Days? GOWE Aluminum Formwork Provides the Solution
In high-rise construction, speed equates to efficiency. Traditional wood or steel formwork systems typically require 6–8 days per floor, whereas GOWE’s aluminum formwork system reduces this to 3 days per floor. ⏱️ Project Timeline Comparison Traditional Formwork Systems: 33 floors × 6–8 days/floor = 198–264 days GOWE Aluminum Formwork: 33 floors × 3 days/floor = […]